Burbank Airport Upgrade 2026

Image

BUR Replacement Passenger Terminal | Hollywood Burbank Airport

The Burbank-Glendale-Pasadena Airport Authority (BGPAA) unanimously approved a guaranteed maximum price (GMP) of $1.11 billion for the design and construction of the airport’s replacement passenger terminal.

Hollywood Burbank Airport will be fully operational during construction, which should not affect travelers’ plans. Once the new 14-gate passenger terminal is complete, the old terminal will be demolished within 12 months and the taxiways will be extended.

Burbank-Airport-Commission-Dashboard-7.1.25.pdf

Construction Camera

<!-- EMBEDDED VIMEO URL: https://vimeo.com/1090523161?p=1s -->

Charrette Workshops -  

Designing a replacement for a 90-year-old airport terminal is no easy task. That’s why we turned to our community for help.  Click to view presentations:  Charrette Workshops | BUR Replacement Terminal | Burbank, CA

Design overview video:

<!-- EMBEDDED ELEVATEBUR URL: https://elevatebur.com/wp-content/uploads/2024/07/elevate_bur___brent_v… -->
More News from Los Angeles
  • Stair Climb Commemorating 9/11/01 There are two 9/11 Stair Climbs in Southern California. Morongo Casino on 9/11/26 and Long Beach World Trade Center 9/12/26, both require pre-registration to participate.
  • Revisiting Comments 25 Years After 9/11/01 - Part 41 The Port Authority of New York and New Jersey's artifact distribution program began in 2010 and concluded in 2016. 50 states and 10 nations rec'd steel from the World Trade Center.
I'm interested
I disagree with this
This is unverified
Spam
Offensive