DWP Committee Meeting: 2023-2024 Budget Workshop 8:30am

Image

FY 2023-24 H2o Supply Investments, H2o Quality Investments & H2o Infrastructure Investments are three topics of the preliminary budget; scheduled for discussion 4/1/23.

Next Meeting: April 1, 2023 at 8:30 a.m. - 10:30am  Meetings are recorded.
Topics: Spring Budget Workshop The DWP-NC MOU Oversight Committee (even months) and DWP Advocacy Committee (odd months) meet every first Saturday of the month. The meetings are broadcast via webcast. You may join the meeting via this link: “Join Meeting” or Join by Phone:
1-213-306-3065 United States Toll (Los Angeles)
1-415-655-0002 United States Toll

Meeting number (access code): 2488 755 8545

FY 2023-24 Water Supply Investments

  • The Los Angeles Groundwater Replenishment Project will recharge the San Fernando Groundwater Basin with advanced purified recycled water produced by the Donald C. Tillman Water Reclamation Plant
  • The 1.5 MGD Advanced Water Purification Facility (AWPF) project will produce recycled water for the Hyperion Water Reclamation Plant and the Los Angeles World Airports for non-potable water.
  • LADWP and Los Angeles Departments of Public Works, Recreation and Parks, are implementing the Stormwater Capture Parks Program to build up to 3,000 acre-feet of stormwater capture capacity at nine parks in the Eastern San Fernando Valley.
  • The 1 MGD Hyperion Membrane Bioreactor (MBR) Pilot Facility and Study is a collaboration between West Basin MWD, LASAN, and LADWP to study an MBR treatment process at the Hyperion Water Reclamation Plant (HWRP).

FY 2023-24 Water Quality Investments

  • The Fairmont Sedimentation Plant will pre-treat 465 MGD of the Los Angeles Aqueduct and State Water Project-East water sources for the Los Angeles Aqueduct Filtration Plant.
  • The Tujunga Centralized Treatment Project will address groundwater contamination of the Tujunga Well Field.
  • The North Hollywood West Wellhead Treatment Project will provide remediation treatment to 18 MGD.
  • The North Hollywood Centralized Treatment Project is a 24.7 MGD groundwater treatment facility for contamination at the Rinaldi Toluca Well Field.

FY 2023-24 Water Infrastructure Investments

  • 225,000 feet of mainline pipe will be replaced, prioritizing mainlines with the highest risk of failure.
  • Vault 2 of the Headworks Flow Control Station is being poured and requires approximately 150 CY of concrete. This project is located at the Tom LaBonge Headworks Water Complex.
  • Capital improvements were performed on Mountaingate Tank, which included interior recoating, reroofing, and replacing the tank roof hatch
More News from Los Angeles
  • Strawberry Festival: Local Vendors Vendors at the upcoming Strawberry Festival (May 18-19) originating from the San Fernando Valley are listed to ease your task to support them with a purchase or encouraging word.
  • The Hyacinth Fellowship Hyacinth Fellowship founder Maryann Jacobi Gray passed a year ago, April 2023, but the impact of her story and structure of her organization continues to heal and help.
I'm interested
I disagree with this
This is unverified
Spam
Offensive